Pharmaceutical Handling System

This project was designed and built for a pharmaceutical manufacturer. Their distribution center needed a custom material handling solution to make on demand shipments of their vaccine. Designed and built by Tinsley Design & Fabricating for reliable operation in a refrigerated environment, a series of eight transfer stations will receive the refrigerated cartons from inventory via conveyors [...]

2024-12-17T17:38:25+00:00

Specialized Assembly Fixture

This project was designed to replace a traditional work bench for the assembly and wiring of a large electrical chassis. The assembly process requires the chassis to be turned upside down and rotated on its side several times. By designing a specialized table to hold and rotate the chassis we were able to improve the workers ergonomics [...]

2024-12-17T17:41:57+00:00